top of page

CLEANER WATER. STRONGER FUTURE.

Water pipe upgrades. Lead replaced. Performance  restored.

We replace ageing lead and galvanised pipes

with modern MDPE systems using trenchless

technology, Better water quality, stronger

flow and built to last over 100 years.

Corroded old lead pipe versus clean new MDPE pipe.

Cleaner, safer
drinking water 

Eliminates the risk

associated with lead.

Improved water
pressure & flow

Larger internal diameter 

for better performance.

Built to last
100+ years

High-performance MDPE

designed for the future.

Minimal disruption,
maximum results 

 

Trenchless installation

in as little as one day

PROJECTS.

Real projects.
Real results.

Showcasing some of our residential upgrades from 

Hello Mole®,

Red brick semi-detached house with gravel driveway.
Modern two-story brick home with a green door and garage.

Residential Upgrade

Manningtree, Essex.

Lead pipe replaced with 25mm MDPE

Minimal disruption, Completed in one Day.

Residential Upgrade

Buckhurst Hill, Essex

Main diverted to suit a relocated kitchen, 14m of 25mm MDPE, Completed in 1 Day.

Semi-detached house exterior with bay windows and white render

Residential Upgrade

20m water supply upgrade in 25mm MDPE.

Minimal Disruption, Completed in 1 Day

Hello Mole.

®

Minimal disruption. Maximum Performance

SERVICES

Water Pipe Replacement

Leak Repairs

Impact Moleing

Water Supply Diversions

Locating Supplies

AREAS COVERED

London

Hertfordshire

Surrey

Cambridgeshire

EXPLORE

About

CUSTOMER CARE

Kent

Sussex

GENERAL ENQUIRIES

WEBSITE

SERVICE AREA

London &
south East England 

COMPLIANCE

EUSR National Water Hygine

Street Works

Pro Trainings

©

®

2026 Hello Mole. All rights reserved.

Cookie Policy

UNDERGROUND. REINVENTED.

bottom of page