PROJECT 3

Damaged Supply
Replacement.

LOCATION

SOUTH LONDON

PIPE SIZE

25MM MDPE

DISTANCE 

20 METRES

COMPLETED

1 DAY

About this project

Completed in Croydon, South London, this project involved replacing an ageing and restricted water supply after the customer experienced poor pressure and inconsistent flow throughout the property. Using trenchless moling, we installed approximately 20 metres of new 25mm MDPE pipe with only three small access excavations. The new supply was connected, pressure-tested and fully reinstated within one day, delivering improved flow and reliable pressure with minimal disruption and maximum performance.